Wir entwickeln Lösungen, die auf Ihr Projekt zugeschnitten sind, und bieten wettbewerbsfähige Preise.
Wir werden Sie in 10 Minuten kontaktieren.

Füllen Sie das untenstehende Formular aus und wir werden uns innerhalb von 24 Stunden bei Ihnen melden!

Hanger Bolts Solar Mounting Components Manufacturer

🕢 [ Füllen Sie das Formular aus und wir werden innerhalb von 24 Stunden antworten!]

Product Overview

Hanger Bolts for Solar Mounting Components are critical fasteners designed for securely attaching solar panel mounting systems to various roof structures. Manufactured with SUS 304 stainless steel or Zinc-Nickel Alloy, these bolts guarantee long-term durability, exceptional corrosion resistance, and reliable system stability across residential, commercial, and industrial solar applications.

Engineered for diverse roof types like trapezoidal metal roofs, corrugated metal roofs, and sandwich panel roofs, these bolts are essential components of high-performance photovoltaic mounting systems.


Key Features and Benefits

  • Premium Material: Constructed from SUS 304 Stainless Steel (A2-70), ensuring high strength and corrosion resistance.
  • Wide Compatibility: Fits wooden rafters (pointed thread) and steel purlins (self-drilling head).
  • Complete Installation Kit: Includes EPDM rubber washer, 3 flange nuts, and an adapter plate (L-Foot or stainless steel bracket).
  • Superior Load Capacity: Resists wind speeds up to 60 m/s and snow loads up to 1.6 kN/m².
  • Waterproof Design: Equipped with EPDM rubber washers to prevent water ingress.
  • Flexible Sizing Options: Available in M8, M10, M12 thread sizes with lengths ranging from 100mm to 350mm.
  • Long Service Life: Backed by a 10-year warranty and a 25-year operational life.
  • International Certifications: Compliant with ISO9001, CE, TUV, and standards like AS/NZS 1170, DIN 1055, JIS C8955:2017.

For complete mounting solutions, explore our solar mounting accessories and solar racking systems from Firstsolar.


Technical Specifications

ParameterDetails
MaterialSUS 304 Stainless Steel, Zinc-Nickel Alloy
Thread SizesM8, M10, M12
Lengths Available100mm, 150mm, 160mm, 180mm, 200mm, 250mm, 300mm, 350mm
Applicable Roof TypesTrapezoidal, Corrugated, Sandwich Panels, Standing Seam Metal Roofs
Mounting SubstratesWooden Rafters, Steel Purlins
Accessories IncludedEPDM Washer, 3 Flange Nuts, Adapter Plate (L-Foot / Long Plate)
Wind Load CapacityUp to 60 m/s
Snow Load CapacityUp to 1.6 kN/m²
Installation Angle0° to 75°
Compliance StandardsISO9001, CE, TUV, AS/NZS 1170, DIN 1055, JIS C8955:2017, IBC 2009, CBC 2010
Warranty10 Years
Service Life25 Years
Color OptionsNatural Silver or Customized

For durable foundations, check our solar roof hooks that work perfectly with hanger bolts.


Installation Steps

  1. Preparation:
    • Drill a pilot hole into the roof’s structural member (wooden rafter or steel purlin).
  2. Bolt Installation:
    • Insert the hanger bolt into the pilot hole.
    • Compress the EPDM washer against the roof surface to ensure a watertight seal.
  3. Adapter Plate Attachment:
    • Fix the L-Foot or long adapter plate to the threaded end of the hanger bolt using the provided flange nuts.
  4. Rail Mounting:
    • Attach the solar mounting rails to the adapter plate, ensuring precise alignment.
  5. Panel Installation:
    • Secure Sonnenkollektoren onto the mounted rails using appropriate end clamps and mid clamps.

For rail components, visit solar rail solutions and optimize your setup.


Usage Scenarios

  • Residential Solar Installations:
    • Installing solar systems on private homes with metal sheet roofs.
  • Commercial Solar Projects:
    • Mounting large-scale PV systems on warehouses, factories, and retail buildings.
  • Industrial Solar Applications:
    • Supporting solar installations on manufacturing plants and logistics hubs.
  • Solar Carports and Shelters:
    • Fastening PV modules to carport frames using hanger bolts and EPDM sealing washers.
  • Adjustable Solar Systems:
    • Systems requiring varied tilt angles from 0° to 75° for optimized energy generation.

Enhance your projects with our solar ground screw foundations for ultimate stability.


Certifications and Compliance

  • ISO9001 Certified Manufacturing: Ensures consistent quality across all production batches.
  • CE and TUV Certifications: Complies with European safety and technical standards.
  • AS/NZS 1170, DIN 1055, JIS C8955:2017 Compliance: Guarantees structural integrity under wind and snow loads.
  • IBC 2009 and CBC 2010 Compliance: Meets U.S. building code requirements.

Every bolt is designed and tested under rigorous protocols, ensuring robust performance in diverse global climates.


Conclusion

Hanger Bolts for Solar Mounting Components are a vital piece of any solar panel support structure. With their durable materials, flexible design, and easy installation process, they are the preferred choice for engineers and installers aiming for maximum efficiency and security.

Why choose our hanger bolts?

  • Long-term corrosion resistance.
  • Broad compatibility with different mounting substrates.
  • Proven performance under extreme weather conditions.
  • Complete kits for quick and secure installations.
  • Certified to international engineering and safety standards.

Maximize your installation quality and reliability by integrating hanger bolts into your next solar project.

Hilfe-Center

Haben Sie eine Frage? Bitte prüfen Sie diese Frage und Antworten

Firstsolar verfügt über eine eigene Fabrik mit mehr als 80 qualifizierten und erfahrenen Mitarbeitern. Die Produktionslinie ist streng nach hohen Standards ausgerichtet und legt großen Wert auf Qualitätskontrolle und Inspektion.

Natürlich bieten unsere erstklassigen Produktionsingenieure, Techniker und unser Forschungs- und Entwicklungsteam unseren Kunden innovative Designs und zuverlässige Lösungen, die auf mehr als 8 Jahren Erfahrung basieren.

Ja, Firstsolar bietet seit mehr als 10 Jahren OEM-Service, Design-Service und Käufer-Label-Service.

Ja, die Produkte von Firstsolar sind von lSo, sGS, TUV und AS/NZS 1170.2 zertifiziert worden.

Es hängt von der tatsächlichen Bestellmenge und Ihren speziellen Anforderungen ab. Im Allgemeinen wird es 1-2 Wochen sein.

Liegt der Gesamtbetrag unter US$5000, benötigen wir 100% im Voraus; liegt der Gesamtbetrag überUS$5000, benötigen wir30%T/T im Voraus