Diseñamos soluciones a la medida de su proyecto y ofrecemos precios competitivos.
Nos pondremos en contacto con usted en 10 minutos.

Rellene el siguiente formulario y nos pondremos en contacto con usted en un plazo de 24 horas.

Hot Dip Galvanized Photovoltaic C-shaped Steel Base Support Bracket

🕢 [ ¡Rellene el formulario y le responderemos en 24 horas! ]

Quick Overview

This C-shaped steel base locks your solar panels firmly in place. A heavy 85 µm hot-dip galvanized zinc layer shields the bracket from rust, even in harsh coastal climates.


Key Dimensions

  • Height: 41 mm
  • Width: 62 mm
  • Thickness: 2.5 mm
  • Finish: Matte silver-grey galvanized steel

Feature Highlights

BenefitWhat It Means for You
Hot-dip galvanized coating15 + years of corrosion resistance in rain, snow, or salty air
High-strength Q235/Q355 steelWithstands typhoon-level winds and heavy snow loads
Factory-punched slots & holes40 % faster installation—no on-site drilling
15°–45° tilt rangeOptimise panel angle for any season or latitude
Wide temperature toleranceReliable from -30 °C to +80 °C (-22 °F to 176 °F)

Ideal Applications

  1. Utility-scale ground arrays — pair with steel piles or concrete foundations.
  2. Agri-PV canopies — compatible with Agricultural Farmland Solar Mounting Systems to shelter crops or livestock.
  3. Commercial rooftops — low-profile option for flat or gently sloped roofs.
  4. Desert & sandy sites — abrasion-resistant coating stands up to windblown sand.
  5. Coastal installations — optional Zn-Al-Mg upgrade for extreme salt-spray zones.

Fast, Straight-Forward Installation

  1. Position brackets on concrete blocks, screw piles, or driven steel posts.
  2. Bolt through the pre-punched slots.
  3. Adjust the tilt to capture maximum sunlight.
  4. Attach rails and mount your solar modules.

All critical fasteners, clamps, and grounding accessories are available to ship with the bracket kit.


Technical Specifications

  • Material: Q235/Q355 carbon steel
  • Protective layer: ≥ 85 µm hot-dip galvanized zinc (ISO 1461)
  • Load ratings: 1.4 kN/m² snow | 1.5 kN/m² wind pressure
  • Angle adjustment: 15°–45°
  • Standards met: CE • RoHS • ISO-certified production
  • Service life: 25 – year structural lifespan, 15-year anti-corrosion warranty

Why Choose Our Bracket?

  • Cost-effective: From ≈ US $0.40 each on 500-unit orders.
  • Global compliance: Designed for codes in the US, EU, MENA, and APAC.
  • Sustainable: 100 % recyclable, no hazardous finishes.
  • Rapid logistics: 15-20 day worldwide delivery, export-ready wooden crates or pallets.

Need Project Support?

Our engineering team supplies free CAD layouts, wind-load simulations, and samples. We also customise lengths, coating thickness, and hole patterns on request.

Ready to start? Contact us for a fast quote or bespoke design assistance.


Built for the Toughest Environments

  • Deserts: UV-stable, heat-resistant.
  • High-altitude snowfields: Certified snow-load capacity.
  • Coasts & islands: Optional marine-grade zinc-aluminium-magnesium layer.
  • Farms & greenhouses: Fertiliser-resistant finish.

Choose our hot-dip galvanized C-shape bracket for a solar mounting solution that performs—year after year—wherever your project takes you.

Centro de ayuda

¿Tiene alguna duda? Consulte estas preguntas y respuestas

Firstsolar tiene su propia fábrica con más de 80 trabajadores cualificados y experimentados, la línea de producción es estrictamente de acuerdo con altos estándares y conceden gran importancia al control de calidad y la inspección.

Por supuesto, nuestros ingenieros de producción de primera clase, técnicos y equipo de I + D ofrecen un diseño innovador y una solución fiable a los clientes sobre la base de más de 8 años de experiencia.

Sí, Firstsolar lleva más de 10 años ofreciendo servicios de OEM, diseño y etiquetado.

Sí, los productos de Firstsolar han sido certificados por ISO, SGS, TUV y AS/NZS 1170.2.

Depende de la cantidad real del pedido y de sus requisitos especiales. Generalmente, será 1-2weeks.

Si el importe total es inferior a $5000, necesitamos 100% por adelantado; si el importe total es superior a $5000, necesitamos 30%T/Tin por adelantado.